August 13: Developed new injector positioning IP that is being prototyped. Worked on flow control to operate at a reactor gas condition of flowing atmospheric pressure argon with trace H2. Tested faster startup systems with some delays due to breaking welds caused by a corresponding differential of tin-melt timing.