by Paul Raybould | Aug 13, 2025 | Blog_post, Uncategorized
August 13: Developed new injector positioning IP that is being prototyped. Worked on flow control to operate at a reactor gas condition of flowing atmospheric pressure argon with trace H2. Tested faster startup systems with some delays due to breaking welds caused...
by Paul Raybould | Aug 7, 2025 | Blog_post, Uncategorized
August 7: Tested SunCells on three stations yesterday and three today. Worked on vacuum and gas flow systems. Also worked on DC ignition current connections since the DC input voltage recorded at the ignition leads is ½ that output by the power supply. This is a...
by Paul Raybould | Aug 5, 2025 | Blog_post, Uncategorized
August 5: Tested SunCells on two stations yesterday and three today. Worked on injectors and conditions. Acquired valuable engineering data and extended the duration and light...
by Paul Raybould | Aug 2, 2025 | Blog_post, Uncategorized
August 1: Tested new instrumentation on Station...
by Paul Raybould | Jul 31, 2025 | Blog_post, Uncategorized
July 31: Tested some new SunCell features on Station 1. Worked on vendor coating...