by Paul Raybould | Aug 5, 2025 | Blog_post, Uncategorized
August 5: Tested SunCells on two stations yesterday and three today. Worked on injectors and conditions. Acquired valuable engineering data and extended the duration and light...
by Paul Raybould | Aug 2, 2025 | Blog_post, Uncategorized
August 1: Tested new instrumentation on Station...
by Paul Raybould | Jul 31, 2025 | Blog_post, Uncategorized
July 31: Tested some new SunCell features on Station 1. Worked on vendor coating...
by Paul Raybould | Jul 31, 2025 | Blog_post, Uncategorized
July 30: Tested non-disclosable technology related to the electromagnetic pumps, injectors, and vacuum pumping system. Of the four new innovations tested, three worked and the other provided useful data. Yesterday was spent improving the...
by Paul Raybould | Jul 29, 2025 | Blog_post, Uncategorized
July 28: Reaction conditions tests were performed on Stations 1 and 3 SunCells. Station 1 Station...
by Paul Raybould | Jul 28, 2025 | Blog_post, Uncategorized
July 25: Tests were performed on electromagnetic pump modifications of Stations 2 and 3 SunCells. For other stations, vendor electron beam weld errors were worked. The blackbody temperature of the run on 07.24.25 was determined to be 5210K based on the pixel...